outre : 2 results

Quadran
POMA-Leitwind handled the delivery, installation and maintenance of six 1.65 MW Hh48 class A LTW80 wind turbines in Guadeloupe.
These machines replace 20 wind turbines installed in the early 2000s on the site of Fonds Caraïbes in Guadeloupe, the island of the French West Indies. The new wind turbines are designed to withstand cyclones.
Work

Material Transport
POMA designs, manufactures and installs tailor-made and reliable industrial transport systems using aerial or ground ropeways. For bulk raw materials or any other controlled production flow, lightweight and adaptable infrastructure provides efficient and sustainable transport.
Domain