plate : 9 results

Wind Energy
Following the merger between POMA and Leitwind, a specialist in onshore wind power, POMA-Leitwind is designing, manufacturing and installing the first multi-megawatt onshore wind turbines assembled in France.
Domain

Glaciers
A new “Glaciers” gondola lift strategically links Plagne Bellecôte resort to the Glacier de la Chaupe. Comprising two sections that can operate independently, it provides a link between 2,700 m and 3,000 m, whatever the weather conditions. Passengers can enjoy the comfort of EVO 2 XLINE cabins, which can accommodate up to 10 people, as well as exceptional 360° panoramic views.
Work

Crémaillère Express
The spa town of Luchon, in the heart of the Pyrenees, has a new gondola lift linking it to its ski resort at an altitude of 1,800 meters. The old gondola lift had already been in operation for 30 years, and the new Luchon Crémaillère Express gondola brings with it the benefits of a new generation of cable cars, symbolizing a modern, sustainable means of transport.
Work

Tlemcen
The Tlemcen gondola lift that connects the city centre to the Lalla Setti Plateau had been at a standstill for four years when it resumed service in 2018. The arrival of the gondola lift was the source of great hope, as it represents a means of transport with high added value for Tlemcen, the ultimate tourist destination.
Work

Galala city
The tourist gondola lift of the new town of Galala City links the urban area to the luxurious seaside resort, travelling the longest stretch in the Middle East. Its glass-floored cabins offer an exceptional journey with a unique view of the superb desert landscapes that border the Red Sea.
Work

Vanoise Express
The emblematic ropeway of the Vanoise Massif mountain range gave rise to the vast Paradiski skiing area in 2003. It held the record as the biggest cabin in the world until 2016.
Work

La repose
Le télésiège de la Repose est un des deux axes structurants de la station de La Norma depuis 1984. Entièrement rénové en 2013, il offre désormais plus de confort aux skieurs, à la montée comme à la descente.
Work

On-site troubleshooting
Limiting the downtime of ropeway systems in operation is our priority. Our specialised technical maintenance teams, present in France and around the world, are always ready to work with you whenever you need. Where expertise or troubleshooting requires it, an on-site maintenance process is implemented, including the assignment of qualified personnel from the Group’s entities and its network of partners. One single goal: limit the consequences of a possible shutdown, whether on a site in France or across the world.
Page

Portrait of Jean Pomagalski
When he created his very first surface lift, did Jean Pomagalski imagine that POMA would establish itself as one of the world leaders in ropeway transport by offering ever more innovative and leading-edge solutions? That these solutions would leave the mountain peaks to find their place in many fields, for various applications: sports, tourism, urban mobility or in the service of science and industry?
News